Email: Password: Remember Me | Create Account (Free)

Back to Subject List

Old thread has been locked -- no new posts accepted in this thread
???
10/20/00 11:19
Read: times


 
#5877 - RE: Geyser controller
Simon,
I don't think its that bad as an assignment. As J says, this is a clock with some frills. The clock is on this site in our tutorials, which are on the search engines. The MAX 7221 is on Maxims site, and a search on 7 segment drivers on Google finds it.

No Its pretty straightforward, but it takes a lot of initiative to be an engineer and this assignment tests it to the full.

STeve

List of 17 messages in thread
TopicAuthorDate
Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      
RE: Geyser controller            01/01/70 00:00      

Back to Subject List